Effluent Treatment Plant capacity, unit design and retention time assessed against the measured effluent load.
Certification that your ETP, STP and air pollution-control systems are adequately sized for the actual pollution load — a capacity-vs-load assessment prepared by GPCB-authorised auditors for consent, expansion and bank requirements.
Aura Environmental Services Pvt. Ltd. prepares ETP, STP and Air Pollution Control (APC) adequacy certificates and reports as GPCB-authorised Schedule-II auditors in Odhav, Ahmedabad. We characterise the actual effluent and emission load using our NABL lab, review the design capacity and each treatment unit, assess adequacy against the discharge and emission norms, and issue a certified adequacy report — with clear augmentation recommendations where a system falls short — for GPCB consent, capacity expansion, consent renewals and financial-institution requirements.

Adequacy assessment at a glance
Every certificate is grounded in measured load and a unit-by-unit review of the plant.
Effluent Treatment Plant capacity, unit design and retention time assessed against the measured effluent load.
Sewage Treatment Plant sizing and treatment stages assessed against occupancy and sewage generation.
Scrubbers, bag-filters, cyclones and stacks assessed against the actual emission load and norms.
Hydraulic and organic load compared to design capacity, unit by unit, to find any bottleneck.
Adequacy for a proposed production increase, with augmentation recommendations where needed.
A signed adequacy certificate for GPCB consent, renewals, CETP membership and financial institutions.
We compare the measured load and treatment performance against design — the basis of a defensible adequacy certificate.
Share your plant details and consent conditions and we’ll scope the assessment.
Request an assessmentA clear, accountable process — so you always know what happens next.
We sample and analyse influent, effluent and emissions in our NABL lab to establish the real load.
We assess design capacity and each treatment unit — flows, retention time, loading and performance.
Measured load is compared to design and norms to determine whether each unit is adequate.
You receive a signed adequacy report — with augmentation recommendations where a system falls short.
Statutory environmental audit and Form-V by a GPCB-authorised auditor.
Learn moreConsent to Establish & Operate — documentation, XGN filing and GPCB liaison.
Learn moreETP / STP and pollution-control design, upgrade and augmentation.
Learn moreGPCB consent, EPR, audits or returns — tell us your requirement and we’ll map exactly what your unit needs, with a clear plan and quote.